Pyrenees FPSO Laboratory HVAC Upgrade:
To address persistent temperature and humidity control issues, OES designed, fabricated and commissioned a new chilled water HVAC package for the Pyrenees Laboratory. The existing oversized DX system was unable to perform effectively in North West WA conditions. The replacement solution required complex rooftop integration and was installed with minimal disruption to ongoing laboratory operations.