Pyrenees FPSO Accommodation AHU Upgrade:
OES designed, fabricated, installed and commissioned new air handling units to resolve legacy moisture carryover issues within the Pyrenees accommodation areas. Due to restricted plantroom access, a split-casing AHU design was engineered to enable installation. Works were completed within a tight schedule during a Singapore shipyard period.